century way

Century Way

Rotherham Metropolitan Borough Council’s commitment to supporting start-up and small businesses. The new development provides 16 offices, 20 workshops and 2 lab spaces. We provided the supply design and installation of the mechanical, Electrical and Plumbing services offering a diverse environment within one building. Project Value £1,100,000.00 over 12 months.

bradford grammar school sports barn

Bradford Grammar Sports Barn

The construction of a large new sports barn structure to facilitate five tennis courts. In addition, the existing changing facilities were upgraded as was existing sports hall reconfigured. Providing the mechanical, Electrical and Plumbing installation working within the school’s normal operations ensuring no distribution to the pupils and schools performance while on site. The large structure has the scale of …

ASAFE warehouse

ASAFE Warehouse

The construction of a new 110,000 sqft, 21m high bay warehouse for the continually expanding client ASAFE/Threesmith. We provided the electrical design and installation working closely with the electrical and lighting requirements of the fully automated racking system. The installation at such a high level providing a challenging installation with the large LV cable supplies, fire protection and lighting design. …

Southmoor House

Southmoor House

The remodelling of the existing office block providing the design supply and installation of the Electrical, Mechanical, and plumbing services. The office building remained occupied through the development working with live and phased services ensuring full operation of the site during work. As well as updating the internal services we also provided the new solar installation covering the whole roof …

Oakworth crematoria

Oakworth Crematoria

The redevelopment of Oakworth Crematoria is part of Bradford MDC Bereavement strategy which aims to upgrade and enhance their ageing facilities. The refurbished crematorium operates to and above national standards of emissions including the removal of mercury and nitrogen oxide pollutants to make them as environmentally friendly as possible as well as future proofing them against upcoming regulation changes. The …

Network House

Network House

The design supply and installation of the Mechanical, Electrical and Plumbing services. We upgraded the existing Warehouse removing all services back to shell construction. Upgrade the incoming electrical HV services and main panel boards. The site consisted of the main warehouse storage and accommodating offices. Overall project value £800,000.00 over a 6-month period.

Clean air zone sign

Bradford clean air zone

The Bradford clean air zone has now been in place for over a year. Over this time, Bradford has seen a dramatic reduction in the levels of air pollution to the lowest levels ever recorded and expect to see continued reductions in the associated health risks of air pollution and the subsequent pressure it places on the NHS. This has …

birds eye limited, leeds

Birds Eye Limited

ECFS have a contract with Birds Eye Limited for the office cleaning. Works include a weekly cleaning schedule for the ground and first floor offices as well as a daily Covid-19 clean.